The number of pipes * the time is a constant proportional to the pool size.
3*12 = 2*18 = 1*36. So one pipe would take 36 hours.
Answer:
He need to earn 32 points on part 2.
Answer:
gfiytfitf
Step-by-step explanation:jhgljhbljkbltfiyf
(0.5,2)
0.5 is x value
2 is y value
l
l
---------------
l
l
x value is on dashed line (0.5)
y value is on more separated line going up and down. (2)
To plot 0.5, you can put it as an equation. 0.5= 1/2. So to plot it, 0.5 is half of 1. So plot it as in between the 1 and 0.
To plot 2 go up to the two on the y axis and then go over 0.5 and plot a point.
That is you're plotted point for (0.5,2)
Hope it helps!
Answer:
(7/4)(2)(2)=7
Step-by-step explanation: