Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
a) 54π cm³
Step-by-step explanation:
area of circle=πr²
9π
π9*6=54π
B=30. all you have to do is minus 9 from both sides then multiply 6 to each side so all thats left is the variable
Side length: 2 cm.
Volume of a cube:
V=a^3
(where V is volume, and a is side length)
If v=8, the formula would now be 8=a^3
Take the cube root of both sides
a=2.