1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Pani-rosa [81]
3 years ago
7

Can sb pls solve this?​

Mathematics
1 answer:
Leto [7]3 years ago
6 0

Answer:

X=9

Step-by-step explanation:

12+15=27

18+x=27

27-18=9

X=9

You might be interested in
Anura found a can of paint that was full. She was able to paint 3 fence posts with the paint. What fraction of the can of paint
Aleksandr-060686 [28]
She used 1/3 of of the paint can on a single fence post
5 0
3 years ago
Read 2 more answers
I NEED THIS ASAP- Point A is located at (-5, -8). Point A is reflected across the X-axis to create point B. What is point B?
Rasek [7]

Answer:

(5,-8)

Step-by-step explanation:

if it is reflected across the X axis and this is in quadrant 3 that means if it was reflected it would fall in quadrant 2

6 0
3 years ago
The U.S. Bureau of Labor Statistics reports that of persons who usually work full-time, the average number of hours worked per w
alukav5142 [94]

Answer:

The standard deviation of number of hours worked per week for these workers is 3.91.

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.

In this problem we have that:

The average number of hours worked per week is 43.4, so \mu = 43.4.

Suppose 12% of these workers work more than 48 hours. Based on this percentage, what is the standard deviation of number of hours worked per week for these workers.

This means that the Z score of X = 48 has a pvalue of 0.88. This is Z between 1.17 and 1.18. So we use Z = 1.175.

Z = \frac{X - \mu}{\sigma}

1.175 = \frac{48 - 43.4}{\sigma}

1.175\sigma = 4.6

\sigma = \frac{4.6}{1.175}

\sigma = 3.91

The standard deviation of number of hours worked per week for these workers is 3.91.

6 0
3 years ago
Simplify the answer pls
disa [49]

Answer:

Step-by-step explanation:

24/3 - 4

8 - 4 = 4

4 0
3 years ago
Helppppp pleazeee!!!
Tomtit [17]
I believe the answer is Chord AB
3 0
3 years ago
Read 2 more answers
Other questions:
  • What is the opposite of -|-3.65|
    13·2 answers
  • Which of these is an example of discrete data?
    14·1 answer
  • Suppose the homes in Arizona have appreciated an average of 8% per year in the last years.
    7·1 answer
  • What is the slope of the line passing through the points (-5,9) and (2,-12)​
    5·1 answer
  • If the volume of the pyramid is 72cm3, what is it’s height in cm? A.3. B.9. C.12. D.18
    5·1 answer
  • A marker was placed at an altitude that is 15 feet below sea level.
    12·1 answer
  • Find the value of x and z<br><br> 20 points lol
    10·1 answer
  • NEED THE ANSWER ASAP
    15·2 answers
  • Please help no links
    15·1 answer
  • It takes the Jones family 3 days to travel 1.240 miles. Write and solve a proportion
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!