Answer:
Yes
Step-by-step explanation:
Given that Machine M, working alone at its constant rate, produces x widgets every 4 minutes. Machine N, working alone at its constant rate, produces y widgets every 5 minutes.
When both machines work for 20 minutes
Machine A would produce = widget and
Machine B would produce = widgets
So we can say that Machine A would produce more widgets than Machine N at that time.
Answer is Yes
7,265 is the average of those two numbers, though i am not sure what the sign that is mentioned is
What are the dimensions of the building?
Total mold spores at end of 9.30 am is 26901.
Step-by-step explanation:
Number of molds = 14000
Rate = 9.7% per hour
Number of hours = 12 am to 9.30 am = 9 hours
Growth of mold = 14000 * 9.7% * 9
= 12901
Total mold spores at end of 9.30 am = 14000 + 12901
= 26901
Hence, the expected number of mold spores at 9.30 am is 26901.
That is the combination of 10 over 3, which is calculated as the quotient of factorials:
n!/k!(n-k)!
where n = 10 and k = 3:
= 10!/3!(10 - 3)!
= 10!/3!*7!
= (10*9*8)/(3*2*1)
= 720/6
= 120
therefore there a re 120 possible different groups