1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kupik [55]
3 years ago
7

Ill choose brainliest if bestt

Mathematics
1 answer:
nordsb [41]3 years ago
6 0

Answer:

A rectangle.

Step-by-step explanation:

The shape of the data distribution is a rectangle.

You might be interested in
Someone please help me
SOVA2 [1]
Gosh, when I saw that my mind went blank
6 0
3 years ago
I am in need of help
kvv77 [185]
CAD= BAD
AD=AD( the same side of two angles).
8 0
3 years ago
Before changes to its management staff, an automobile assembly line operation had a scheduled mean completion time of minutes. T
Sergio [31]

No, we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Given mean of 15.5 minutes , standard deviation of 1.7 minutes, sample size of 90 and sample mean of 15.4 minutes.

We can do the following study for conclusion:

Firstly the null hypothesis is

H_{0}: x=15.5

The alternate hypothesis is

H_{1}: x < 15.5

since the value is less than this is a one tailed test.

Z=x bar-x/d/\sqrt{n}

where x is sample mean and d is standard deviation.

Z=15.4-15.5/1.7/\sqrt{90}

=-0.1/1.7/9.4868

=-0.560

Critical value of Z at 0.1 level of significance

Z=-1.28

We fails to reject the null hypothesis since -0.560>-1,28

Hence we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Learn more about hypothesis at brainly.com/question/11555274

#SPJ4

Question is incomplete. It should include:

mean of 15.5 minutes ,

standard deviation of 1.7 minutes,

sample size of 90

and sample mean of 15.4 minutes.

5 0
2 years ago
Which of the matrixes can be added together? Choose all that apply.
katen-ka-za [31]
<h3>Answer: A and C</h3>

Both matrices are 1 x 4 matrices. This notation says there is 1 row and 4 columns. The number of rows must match up, as well as the number of columns, in order for matrix addition to be possible. This is so the corresponding elements pair up and add together. For instance, the 5 and -2 pair up and add together for matrices A and C.

4 0
3 years ago
PLEAS HELP<br><br><br><br><br><br> What is the distance between (4,7)<br> and (5,72
Trava [24]

Answer:

9

Step-by-step explanation:

Since the y-values are the same, you calculate the absolute value of -5 - 4. That is 9.

5 0
3 years ago
Read 2 more answers
Other questions:
  • 1. (39 x 5)
    5·1 answer
  • Simplify this correctly and get a lot of points! ;) ;) ;)<br> 9x- 7i &gt; 3 (3x-7u)<br> ;)
    8·1 answer
  • Edwina measured the length of this swimming pool by drawing similar triangles as shown. What is the best estimate of p, the leng
    8·2 answers
  • Jerry measured and timed the descent of a diving bell spider in a large fish tank. The spider reached a position 4 1/2 inches be
    13·1 answer
  • Solve.
    8·2 answers
  • What is the solution of the system? Use elimination.<br> 5x + 6y = 17<br> −10x − 9y = −43
    8·1 answer
  • Construct a​ 95% confidence interval for the population standard deviation sigma of a random sample of 15 crates which have a me
    9·1 answer
  • Solve for x.<br> 3x + 2<br> 2x + 6<br> x = [?]
    5·1 answer
  • For a school fund raising project, Aiden and Jacob collected money in the ratio 3.5;6.8. Jacob collected $115.50 more than Aiden
    14·1 answer
  • Sets A and B are subsets of the universal set U.These sets are defined as follows.U={k, m, q.7.x, 2)A ={k, g)B={m,q)Find the fol
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!