Answer:
Total equivalent unit 1,425 units
Explanation:
<em>Under the first-in -first out system, to account for the units completed in a period, it is assumed that the opening inventory units are first completed and the balance represents the newly introduced.</em>
<em>Fully worked represents unit of inventory started this this period and completed this period</em>
Fully worked = completed units - opening inventory
Fully worked = 1200 -750 = 450 units
Item Units Equivalent Units
Opening WIP 750 750×50% 375
Fully worked 450 450× 100% 450
Closing WIP 800 800× 75% <u> 600</u>
Total equivalent unit <u>1,425</u>
Note the opening inventory has 50% work done last period so the balance of 50% i.e (100 - 50) is completed this period
Answer: 204.76%
Explanation:
In the earlier scenario, furniture maker manufactured 47 (42 non defective) pieces per 5 laborers working 8 hours day.
Thus, the productivity in terms of units per labor hour is as follows:

= 1.05
Similarly, after the process improvement, the productivity in units per labor hour would be:

= 3.2
Thus change in productivity would be calculated as:

= 2.047 × 100
= 204.76%
Thus, the productivity of non defective parts would increase by 204.76%.
Answer:
The correct answer is True.
Explanation:
The steps to follow to create a work breakdown structure are as follows:
1. Organize a meeting and share with the main stakeholders: team members are one of the most valuable assets in the process of creating the work breakdown structure. They have the knowledge, experience and creativity necessary to define each deliverable reaching the most specific details.
2. Complete the definition of all project deliverables: it is about going one step beyond the level reached in the planning and 100% complete the information on all project deliverables, including internal and external, associating each one with its estimated completion time.
3. Break down each deliverable into smaller, more manageable parts: it is about achieving a realistic level of work planning by the project manager, which ensures that, without interfering with the total estimated project deadline and the overall plan, it can be completed by the work teams. It is about determining work packages. These units constitute the lowest level of the EDT and are pieces of work that are specifically assigned to a person or a team of people to be completed, under the supervision of the Project Director. It is recommended that they focus on a single point of responsibility. The work packages will be used later to define the activities and tasks in which the project is divided.
4. Review the results obtained: with the stakeholders, both at the time of finalizing the elaboration of the work breakdown structure, and when modifications or updates are included, if applicable. It is essential to avoid overlaps.