
I'm not sure if this is right. I didn't feel confident with my answer.
Answer:
hey,
your answer Is 1. :)
Step-by-step explanation:
no matter how many lines we try to draw which pass thru broh A and B, there would just be 1 straight line passing thru both points A and B.
I didn't do the activity tho
you can use a plain sheet of paper as a plane. and draw points A and B on it and then connect them drawing a straight line from A to B.
to graph a LINEar equation, since it's just a straight line, recall, to draw a straight line all you need is two points.
so we can just pick two random "x" values, hmmmmm say x = 0, what's "y"?
y = 7(0)-7 => y = -7....................................... so that gives us the point (0, -7)
hmmm x = 2, what is "y"?
y = 7(2) - 7 => y = 14-7 => y = 7................. so we get the point (2, 7).
then just plot those, and run a line through them.
Answer:
28 - 4x
Step-by-step explanation:
![18 -2 [x + (x - 5)] \\ = 18 - 2 [x + x - 5] \\ = 18 - 2 [2x - 5] \\ = 18 -4x + 10 \\ = 28 - 4x \\](https://tex.z-dn.net/?f=18%20-2%20%5Bx%20%2B%20%28x%20-%205%29%5D%20%20%5C%5C%20%20%3D%2018%20-%202%20%5Bx%20%2B%20x%20-%205%5D%20%20%5C%5C%20%20%3D%2018%20-%202%20%5B2x%20-%205%5D%20%5C%5C%20%20%3D%2018%20-4x%20%20%2B%2010%20%5C%5C%20%20%3D%2028%20-%204x%20%5C%5C%20)
Answer:
W = 15900 ft.lb
Step-by-step explanation:
From the given information.
Consider y to be the distance from the ground towards the bucket of the cement.
At height y, suppose the bucket is lifted by Δy.
Then, the workdone can be = 500Δy + 0.5(75 - y) Δy
where;
The bucket of the cement = 500Δy
The remaining of the rope = 0.5(75 - y) Δy
However; the workdone (W) can be calculated as:


W = 15000 + 0.5 ( 2250 - 450)
W = 15000 + 900
W = 15900 ft.lb