Answer:
Find the number of hours by dividing the distance by mph. The number of hours will be to the left of the decimal point:
284 miles / 58 mph
= 4.896551724
= 4 hours
2) Find the number of minutes by multiplying what is remaining from step 1 by 60 minutes. The minutes will be to the left of the decimal point:
0.896551724 x 60
= 53.79310344
= 53 minutes
3) Find the number of seconds by multiplying what is remaining from step 2 by 60 seconds. The seconds will be to the left of the decimal point:
0.79310344 x 60
= 47.5862064
= 47 seconds
The answer is 4 hours 53 minutes and 47 seconds approx
It’s kinda hard to read but 3/10 is first on .3, 4/5 is next on .4, and then pi/5 is last on .6
Answer:
answer is the second option m<-2 7/12
Step-by-step explanation:
process:
convert -2 1/4 into an improper fraction
m+1/3 < -9/4
m <-9/4 -1/3
calculate the difference
m<-31/12
turn into a mixed fraction
<u>Answer:</u>
(i) Total cost of the flat is Rs. 540000.
(ii) Expenditure incurred on labour is Rs. 150000
<u>Step-by-step explanation:</u>
According to the question, cement cost is Rs. 112500, which represents 75° in the pie chart.
(i) The total cost of the flat is represented by the total 360° in the pie chart.
∴ Using unitary method
75° represents Rs. 112500
⇒ 360° represents =
× 360
= Rs. 540000
∴ Total cost of flat = Rs. 540000
(ii) Similarly, to calculate the cost of labour, represented by 100° in the pie chart, we can use the unitary method:
75° represents Rs. 112500
⇒ 100° represents =
× 100
= Rs. 150000
∴ Cost of labour = Rs. 150000
Like 5+0=5 or maybe 5+1 and 6-1