Answer:
Okay and? im confused there is no dot plot or question here...
Step-by-step explanation:
Answer:
-9
Step-by-step explanation:
Let x = number
2/3 (x) = -6
(x) = -6 divided by 2/3
x = -9
It’s should be -30 instead of 30 so the answer would be y= -3
T = kh where t = tons and h = hours, k is the constant of variation
This is direct variation.
27 = k*3
= 27/3 = 9
Equation of variation is t = 9h
Amount produced in 8 hours t = 9*8 = 72 tons Answer
Answer:
Therefore, the mean and the standard deviation for the number of electrical outages (respectively) are 0.26 and 0.5765 respectively.
Step-by-step explanation:
Given the probability distribution table below:

(a)Mean
Expected Value, 
=(0*0.8)+(1*0.15)+(2*0.04)+(3*0.01)
=0+0.15+0.08+0.03
Mean=0.26
(b)Standard Deviation

Standard Deviation 

Therefore, the mean and the standard deviation for the number of electrical outages (respectively) are 0.26 and 0.5765 respectively.