To find how much time the machine that took the longer job is, you would create an equation in terms of X, the amount of time it takes one of the machines.
Please see the attached picture for the work.
51 minutes is the longer time.
34 minutes for the other machine.
It's 248.3333 (but with the 3s repeating)
Answer:
7 is the positive whole number which we can multiply by 3 and add 1, or multiply by 2 and add 8; and it will give the same answer.
Step-by-step explanation:
Multiplying the positive whole number 7 by 3 and adding 1 will get:
(7 × 3) + 1 = 21 + 1 = 22
Multiplying the positive whole number 7 by 2 and adding 8 will get:
(7 × 2) + 8 = 14 + 8 = 22
Therefore, 7 is the positive whole number which we can multiply by 3 and add 1, or multiply by 2 and add 8; and it will give the same answer.
Answer:
1~30
2~3
3~40
4~70
5~90
6~90
7~80
Step-by-step explanation:
subtract the total revenue from the total cost