1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
mote1985 [20]
3 years ago
14

Help me please thank you

Mathematics
1 answer:
Lynna [10]3 years ago
5 0
Nice excellent wonderful
You might be interested in
A parallelogram has symmetry with respect to the point of intersection of its diagonals. t/f?
Anna007 [38]
It is true that a parallelogram has symmetry with respect to the point of intersection of its diagonals. 
5 0
3 years ago
Solve the system by elimination -3x+4y=16 3x+y=4
Illusion [34]
X's cancel 5y = 20 y= 4 X=0
7 0
3 years ago
True or false? The GCF of any two odd numbers is always odd
nevsk [136]
The answer to this question would be true.

An odd number wouldn't have any 2 in their factor because it is the definition of odd number, can't be divided by 2. Since they have no probability of having factor 2, then their GCF would not become an even number.
4 0
3 years ago
Find all real values of $v$ that satisfy the equation $(v+6)^2 = 324$. If you find more than one, then list your values in incre
Karolina [17]
We have that

(v+6)^2 = 324-----> I raise to 1/2 both members----> [(v+6)^2]^(1/2)=(324)^(1/2)[(v+6)]=(324)^(1/2)-------------> v+6=√324
v=√324-6---------> 18-6=12
v=12

the answer is v=12
8 0
3 years ago
Read 2 more answers
A small business makes 3-speed and 10-speed bicycles at two different factories. Factory A produces 16 3-speed and 20 10-speed b
GarryVolchara [31]

Answer:

Factory A should be operated 6.11 days

Factory B should be operated 6.88 days

The minimum cost for factory A is $6,110

The minimum cost for factory B is $5,504

Step-by-step explanation:

Factory A

Daily production: 16 3-speed and 20 10-speed bikes

Total daily production = 16+20 = 36 speed bikes

Order: 80 3-speed and 140 10-speed bikes

Total order = 80+140 = 220 speed bikes

Number of days = 220/36 = 6.11 days

Cost per day = $1,000

Minimum cost for 6.11 days = $1000 × 6.11 = $6,110

Factory B

Daily production: 12 3-speed and 20 10-speed bikes

Total daily production = 12+20 = 32 speed bikes

Total order = 220 speed bikes

Number of days = 220/36 = 6.88 days

Cost per day = $800

Cost for 6.88 days = $800 × 6.88 = $5,504

6 0
3 years ago
Other questions:
  • In March, Delphine's house had 40\%40%40, percent more snowfall than in February. Delphine's house had fff centimeters of snowfa
    13·2 answers
  • Factor by first factoring out the greatest common 1actor 15x 35x-30 15x-35x-30​
    5·2 answers
  • A) A graph is drawn below.<br> Explain how you know that y is<br> not directly proportional to x.
    7·2 answers
  • An artist is selling children's crafts. Necklaces cost $3.25 each, and bracelets cost $2.50 per each. The artist plan to have a
    15·1 answer
  • cathy drank 600 milliliters ofwater at school and anther 400 at home how many liters of water did she drink
    7·1 answer
  • What is the final elevation if a whale starts at -9m and changes 11m?
    5·1 answer
  • Solve for x<br> (X+1)(x+5)=(x+3)(x-1)
    14·2 answers
  • What triangle is formed with the angles 32 126 and 32
    8·1 answer
  • 2x squared plus 16x minus 10 equals 0. please solve for the solution
    10·2 answers
  • The figure shows part of the concrete slab which is used to make drains and its cross-section. it is made up of a cuboid of dime
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!