Answer: 7,5
Step-by-step explanation:
C. Because you have to look for the greatest number. Disregard whether it is negative or positive. Since you are looking for steepness. That does not matter.
Answer:
E
Step-by-step explanation:
the weight of the packaging materials is 12 oz. There are 16 oz in a pound. If the vase weighs 3 lb 11 oz, it would take 5 more oz to reach the next pound, and there was another 7 oz after that. You would then do 5 + 7, which is 12, so the packaging materials weigh 12 oz.
Answer:
6.84 ≤ x ≤ 37.39
Step-by-step explanation:
we have
-----> equation A
we know that
The company wants to keep its profits at or above $225,000,
so
-----> inequality B
Remember that P(x) is in thousands of dollars
Solve the system by graphing
using a graphing tool
The solution is the interval [6.78,39.22]
see the attached figure
therefore
A reasonable constraint for the model is
6.84 ≤ x ≤ 37.39
Answer:
1,195,742.25 (final answer since instructions did not include rounding up or anything)
Step-by-step explanation:
n = 4
The given expression is:
9^8 ÷ 9n
USE PEMDAS order of operations and solve:
9^8 ÷ 9n
= 43046721 ÷ 9n
Substitue n with 4 and solve:
43046721 ÷ 9(4)
= 43046721 ÷ 36
= 1,195,742.25