1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Tom [10]
3 years ago
5

You attempt to telnet to system 192.168.1.240. You receive the following message: "Connecting To 192.168.1.240...Could not open

connection to the host, on port 23. No connection could be made because the target machine actively refused it." What may be the problem?
Computers and Technology
1 answer:
Serjik [45]3 years ago
3 0

Answer:

firewall

Explanation:

The firewall could be used to protect the network from unauthorised access.Usually an ip could be whitelisted so it could transfer packets between allowing it connect through.

You might be interested in
After clicking the Start button on your computer screen desktop, what option would you then select to examine system components
Sveta_85 [38]
You can find the components that you wanted to modify in : C. control panel

You can adjust your computer's setting through control panel, whether it's your system and security, hardware, net work setting, etc

hope this helps
4 0
4 years ago
Read 2 more answers
What is input process<br>​
riadik2000 [5.3K]

Answer:

describing the structure of an information processing program or another process. Many introductory programming and systems analysis texts introduce this as the most basic structure for describing a process.

Explanation:

  • A requirement from the environment (input)
  • A computation based on the requirement (process)
  • A provision for the environment (output)

Example: A small engineering firm believes there are problems with its hiring process. Several of the junior engineers that have been hired remained at the firm for less than one year. This is a considerable cost to the firm, since recruiting and training new engineers is time consuming and expensive. The human resources manager decides to put together a group of people with extensive experience hiring new engineers. One of their first tasks is to produce an input-output model of the hiring process. They generate the following.

4 0
3 years ago
Darian has a gourmet cupcake business and needs a website to compete with the other bakeries in his area. He has a Google My Bus
Amiraneli [1.4K]

Answer:

The sequences are given below that is 3, 4, 5, 2, and 1.

Explanation:

The following steps are taken to develop the site via Google My Business.

  • In the first case, He signs his Google My Business.
  • In the second case, the site is accessed from the Home menu.
  • In the third case, the appropriate business details become modified.
  • In the fourth case, he attaches photos, like such a cover picture as well as a virtual guide.
  • In the fifth case, he selects the particular domains as well as directs this to the site.
7 0
3 years ago
Compare the elements of the basic Software Development Life Cycle with 2 other models. How are they similar? How are they differ
Artemon [7]

Answer:

Explanation:

One of the basic notions of the software development process is SDLC models which stands for Software Development Life Cycle models. SDLC – is a continuous process, which starts from the moment, when it’s made a decision to launch the project, and it ends at the moment of its full remove from the exploitation. There is no one single SDLC model. They are divided into main groups, each with its features and weaknesses. The most used, popular and important SDLC models are given below:

1. Waterfall model

2. Iterative model

3. Spiral model

4. V-shaped model

5. Agile model

Stage 1. Planning and requirement analysis

Each software development life cycle model starts with the analysis, in which the stakeholders of the process discuss the requirements for the final product.

Stage 2. Designing project architecture

At the second phase of the software development life cycle, the developers are actually designing the architecture. All the different technical questions that may appear on this stage are discussed by all the stakeholders, including the customer.  

Stage 3. Development and programming

After the requirements approved, the process goes to the next stage – actual development. Programmers start here with the source code writing while keeping in mind previously defined requirements. The programming by itself assumes four stages

• Algorithm development

• Source code writing

• Compilation

• Testing and debugging

Stage 4. Testing

The testing phase includes the debugging process. All the code flaws missed during the development are detected here, documented, and passed back to the developers to fix.  

Stage 5. Deployment

When the program is finalized and has no critical issues – it is time to launch it for the end users.  

SDLC MODELS

Waterfall – is a cascade SDLC model, in which development process looks like the flow, moving step by step through the phases of analysis, projecting, realization, testing, implementation, and support. This SDLC model includes gradual execution of every stage completely. This process is strictly documented and predefined with features expected to every phase of this software development life cycle model.

ADVANTAGES  

Simple to use and understand

DISADVANTAGES

The software is ready only after the last stage is over

ADVANTAGES

Management simplicity thanks to its rigidity: every phase has a defined result and process review

DISADVANTAGES

High risks and uncertainty

Iterative SDLC Model

The Iterative SDLC model does not need the full list of requirements before the project starts. The development process may start with the requirements to the functional part, which can be expanded later.  

ADVANTAGES                                        

Some functions can be quickly be developed at the beginning of the development lifecycle

DISADVANTAGES

Iterative model requires more resources than the waterfall model

The paralleled development can be applied Constant management is required

Spiral SDLC Model

Spiral model – is SDLC model, which combines architecture and prototyping by stages. It is a combination of the Iterative and Waterfall SDLC models with the significant accent on the risk analysis.

4 0
3 years ago
Why are streak plates used to test minerals?
Sphinxa [80]

A. Small impurities can cause big changes in the color of a mineral.

5 0
3 years ago
Other questions:
  • Explaim Why the shape of a cell is hexagonal
    15·1 answer
  • What is the most useful advantage of using the Slide Sorter view to rearrange slides instead of using the slide thumbnails in No
    5·1 answer
  • In mathematics, the factorial of a positive integer n, denoted as n! , is the product of all positive integers less than or equa
    10·2 answers
  • To access WordPad, Jill will click on Start, All Programs, Accessories, and WordPad. To access Notepad, Karl will click on Start
    11·1 answer
  • A computer is made of up 6 main components: a) CPU (central processing unit)
    7·1 answer
  • Normal or random variations that are considered part of operating the system at its current capability are ______: ​ a. systemic
    7·1 answer
  • Miriam is very detail oriented within the first month of her new job as a network support specialist she became very good at dia
    12·1 answer
  • On many advanced routers and switches, you can implement QoS through bandwidth management, such as __________, where you control
    5·1 answer
  • Question # 4
    8·2 answers
  • There are two String variables, s1 and s2, that have already been declared and initialized. Write some code that exchanges their
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!