Set up a table.
Pages | Minutes
-----------------------
25. | 30
? | 200
One way is to cross multipy.
200 x 25 = 5,000
30 x ? = 5,000
So do 5,000 divided by 30 and you get your answer
We're looking for C(h), where h is the hundreds of shirts. The fact that they cost "$500 for each additional 100 t-shirt" tells us the slope is 500. Knowing that 1 hundred costs 750, we could use point-slope at this point: (C - 750)/(h - 1) = 500C - 750 = 500h - 500C(h) = 500h + 250 We can check that C(1) = 750 and C(2) = 1250, as we expect. I'll leave it to you to evaluate C(5).
X would be equal to time and y be equal to distance
The y axis would be measuring distance and the x axis would be measuring time. Another name for a speed graph is the distance time graph. The y axis would be measuring the distance covered by the truck in meters and the x axis would be for the time it takes to reach that distance in second.
B) 2-6 would represent contact motion, meaning the vehicle is at rest. The time would be increasing from 2-6 to however the distance remains the same which is 20m
Answer:
y-1=5(x-3)
Step-by-step explanation:
y=mx+b where m=slope and b=y-intercept,
y-y1=m(x-x1)
y-1=5(x-3)