Answer:
i cant see it
Step-by-step explanation:
Answer:
96
Step-by-step explanation:
Day 1: 144-8= 136
Day 2: 136-8= 128
Day 3: 128-8= 120
Day 4: 120-8= 112
Day 5: 112-8= 104
Day 6: 104-8=96
We will start off working on the right hand side.
<span>cot x - tan x </span>
<span>= [cos x / sin x] - [sin x / cos x] </span>
<span>= [(cos x)^ 2 - (sin x)^2] / [sin x cos x] </span>
<span>This is where it gets a bit tougher if you do not have your formula list with you. </span>
<span>(cos x)^ 2 - (sin x)^2 = cos(2x) </span>
<span>sin 2x = 2 sin x cos x </span>
<span>Note that by arranging the second formula, we will have sin x cos x = (1/2) sin 2x </span>
<span>Hence, we will get: </span>
<span>[(cos x)^ 2 - (sin x)^2] / [sin x cos x] </span>
<span>= [cos 2x] / (1/2)[sin 2x] </span>
<span>= 2[cos 2x] / [sin 2x] </span>
<span>= 2cot 2x </span>
Answer: 1.960
Step-by-step explanation:
The value of z we use to calculate a confidence interval with a (
) confidence level is a two-tailed test value i.e. represented by :-

Given : The level of confidence: 
Then, significance level : 
With the help of standard normal distribution table for z , we have

Hence, the value of z should be used to calculate a confidence interval with a 95% confidence level =1.960
Answer:
Step-by-step explanation:
Given that a firm has a price of $5, an average total cost of $7, and an average variable cost of $4
Price = 5
Var cost = 4
Contribution = 1 dollar per unit
Since contribution is positive, there is scope for getting profit by increasing production.
In the short run, you should __operate______(operate/shut down) because __Price______exceeds ________ average variable cost price . In the long run, you should __exit______(stay in/exit) the market because ________ average total cost price exceeds____price.______average variable cost price average total cost