Answer:
1221 - 321 = 900
Step-by-step explanation:
Answer:
True
Step-by-step explanation:
A six sigma level has a lower and upper specification limits between
and
. It means that the probability of finding no defects in a process is, considering 12 significant figures, for values symmetrically covered for standard deviations from the mean of a normal distribution:

For those with defects <em>operating at a 6 sigma level, </em>the probability is:

Similarly, for finding <em>no defects</em> in a 5 sigma level, we have:
.
The probability of defects is:

Well, the defects present in a six sigma level and a five sigma level are, respectively:
Then, comparing both fractions, we can confirm that a <em>6 sigma level is markedly different when it comes to the number of defects present:</em>
[1]
[2]
Comparing [1] and [2], a six sigma process has <em>2 defects per billion</em> opportunities, whereas a five sigma process has <em>600 defects per billion</em> opportunities.
That will be easy. It could be 12/56+3/56 or, 7/56+8/56 or, 10/56+5/56.
Answer:
0.13 ft/min
Step-by-step explanation:
We are given that

We have to find the increasing rate of change of height of pile when the pile is 12 ft high.
Let d be the diameter of pile
Height of pile=h
d=h
Radius of pile,r=
Volume of pile=

h=12 ft
Substitute the values



Answer:
2πr
Step-by-step explanation: