Answer:
250
Step-by-step explanation:
Number of labourers * Number of days worked = Total number of working days
Total number of working days to construct a 4km long road:
Total mumber of working days to construct a 8km long road:
Labourers: 20000 ÷ 80 = 250.
250 labourers are required.
Answer:
It will be 0.2
Step-by-step explanation:
Hope this Helped
STEP 1:
Divide the length of the ribbon by the size of the pieces.
12 inches= 1 foot
= 9 ft ÷ 15 inch pieces
convert ft to inches
= (12)(9) ÷ 15
= 108 ÷ 15
= 7.2 pieces from one roll
STEP 2:
multiply the number of pieces that can be cut from one roll by the number of rolls
= 7.2 pieces * 5 rolls
= 36 pieces total from 5 rolls
ANSWER: The greatest number of 15-inch pieces that can be cut from five 9-foot rolls is 36.
Hope this helps! :)
If this is asking how to write this as a complex fraction, here's how:
First, do the whole number (4) multiplied by the diameter (4) to get 16. Then you take 16 and add this to the numerator (1) to get 17. Then your final answer is this number (17) over the original denominator (4), or 17/4
Hope this helps :)