The answer is 16 units
An easy way to find the perimeter is remembering the formula of a+b+c.
So in this case, you count how many units each line of the triangle it covers. 4+6+6= 16
C = 220T + 1890.
Solve the equation for T.
220T = C - 1890
T = C/220 - 8.6
The steel produced is expected to be sold at a price of $310 per ton.
310 $/ton is a rate or slope. Write a linear equation where x is tons of steel produced and y is selling price of the steel.
y = 310x
Write and solve an equation to find the amount of steel produced if the selling price is equal to the cost of production.
* Here, note that the cost of production and tons of steel in the first equation is in the millions. The equation we just wrote for the selling price was in x tons of steel. This only matters in regards to the units you specify because; million/million = 1
The unit multiplier of all variables must be specified as same. Either everything is in millions or not.
Here, I'll leave everything in millions, change x (tons of steel) to T (mill tons steel) and "y" to "S" in million dollars selling price.
S = 310T
Set equal to Cost equation.
220T + 1980 = 310T
Solve for T, million tons of steel produced.
1980 = 310T - 220T
1980 = 90T
T = 1980/90
T = 22 million tons steel produced
A) (-4,2π/3)
b) (4,4π/3)
c) (-2,π/3)
d) (2,5π/3)
Answer:
C. Get it by itself
Step-by-step explanation:
When solving for a variable, whether it be an inequality, a factor, or an algebraic expression. Getting the specified variable by itself is the most effective and best way to get that answer to your question. The other two answers here do not make any sense whatsoever.