The rate of mr Rodriguez to complete 1 job is 1/3 while
that of his assistant is 1/4.5.
So if mr Rodriguez works for 1 hour, the job left would be
2/3 of the job. So the total time needed by assistant is:
(2/3) / (1/4.5) = 3 hours