<span>4x</span>² <span>+ 13x + 3=
4x</span>² + 12x + x + 3 =
4x(x+3) + (x+3) =
(4x+1)(x+3)
I think it is B -2 < x < 2
I think the answer is 0
8*3=24
24 *0=0
Answer:
$225
Step-by-step explanation:
The area to be fenced in is 20 ft by 45 ft, or 900 ft^2. But "25 per foot based on the area" is illogical. Please ensure that you have copied this problem down accurately, and be sure to provide units of measurement: did you mean $25 per square foot, or per foot, or what?
The fencing cost is usually dependent on the unit cost and the length of the yard perimeter. The perimeter is P = 2L + 2W, which here is P = 2(45 ft) + 2(20 ft), or 130 ft. If the fencing is 25 cents per foot, $130 ft of fencing would come to $32.50.
Answer:
21.68 minutes ≈ 21.7 minutes
Step-by-step explanation:
Given:
Initial temperature
T = 100°C
Final temperature = 60°C
Temperature after (t = 3 minutes) = 90°C
Now,
using the given equation
at T = 90°C and t = 3 minutes
or
taking the natural log both sides, we get
3k =
or
3k = -0.2876
or
k = -0.09589
Therefore,
substituting k in 1 for time at temperature, T = 65°C
or
or
or
taking the natural log both the sides, we get
( -0.09589)t = ln(0.125)
or
( -0.09589)t = -2.0794
or
t = 21.68 minutes ≈ 21.7 minutes