Answer:
$9.2
0
Explanation:
The calculation of the Finishing Department is shown below:-
Plant - wide overhead rate = Total overhead ÷ Total machine hour
= ($470,000 + $737,900) ÷ ($470,000 + 133,950)
Plant wide overhead rate = $2 per machine hour
Machine hour for product = 4.2 + 0.4
= $4.6 machine hour
Applied overhead = Machine hour for product × Plant wide overhead rate
= $4.6 × $2
= $9.2
0
Answer: check
Explanation:
A <em>check</em> is drawn on a financial institution and is payable upon demand.
Answer:
Option E
Explanation:
A variable cost refers to the business expense that varies in relation to revenue from manufacturing. Based on the volume of output of a business, variable expenses gets significantly impact; these increase as productivity increases, and decline as production declines. Sources regarding variable costs typically involve raw material and storage costs.
Thus, from the above we can conclude that all of the mentioned costs are variable costs as direct labor , bottles and water will all increase as the level of production will increase.
Answer:
1) Part 1. Operating Income = Revenue - Operating cost
=201,000 - 56,000
=$145,000
Part 2. Operating Income = Revenue - Operating cost
= 159,000 - 55,000
= $104,000
Part 3. Operating Income = Revenue - Operating cost
= 89,000 - 15,000
=$74,000
2. Part 1. Operating Income = Revenue - Operating cost
=201,000 - 45,600
=$155,400
Part 2. Operating Income = Revenue - Operating cost
=159,000 - 25,000
=$134,000
Part 3. Operating Income = Revenue - Operating cost
=89,000 - 55,400
=$33,600
Answer:
<em>The</em><em> </em><em>corr</em><em>ect</em><em> </em><em>answe</em><em>r</em><em> </em><em>is</em><em> </em><em>:</em><em>-</em> Measurable gain