Answer: jpeg becauuse itss correct
Answer:
One sheave means that you are using a single drum winder. They are the worst! Double drum winders control easier, brake better and are much more efficient. They save time ( two skips or cages) and can be clutched to perform faster shift transport. A single drum is slow, unbalanced and can be a nightmare if it trips out during hoisting. If the brake system is not perfect it can be a real hairy experience. For a runaway single drum, there is no counterbalance effect. It always runs to destruction. With a double drum, the driver still has a chance to control the winder to a certain extent and he has two sets of brakes to rely on. A single sheave could also mean a shaft with a single compartment. No second means of escape unless there are ladders or stairways. Not a very healthy situation.
Those are just a few points. I am sure much more can be said in favor of a double drum winder and two or more sheaves in the headgear. Most of the shafts I have worked at have multiple winders and up to ten compartments. They all have a small single drum service winder for emergencies and moves of personnel during shift times. They are referred to as the Mary - Annes. Apparently, the name originated in the U.K. where an aristocratic mine owner named the first such winder after his mistress.
Explanation:
<em>Hope you got it </em>
<em>If you have any question just ask me</em>
<em>If you think this is the best answer please mark me as BRAINLIEST</em>
<u><em> </em></u>Answer:
1) Press Ctrl + Alt + Del
2) Click the power button in the bottom-right corner of the screen.
3) From the desktop, press Alt + F4 to get the Shut Down Windows screen.
and that's how to shut down your computer
<u><em></em></u>
<u><em>Please mark as brainliest if answer is right</em></u>
Have a great day, be safe and healthy
Thank u
XD
Answer:
Option (C) is the correct option to the following question.
Explanation:
The following option is correct because the unit testing is the process of testing a single unit of software at a time, which means the testing of each and every program separately.
In simple words, Unit testing a process of testing in which the developer executes the single method or a function, statements or loop in the program of the software to checking is it working fine or not.
Answer:
Step by step explanation along with code and output is provided below
Explanation:
#include<iostream>
using namespace std;
// print_seconds function that takes three input arguments hours, mints, and seconds. There are 60*60=3600 seconds in one hour and 60 seconds in a minute. Total seconds will be addition of these three
void print_seconds(int hours, int mints, int seconds)
{
int total_seconds= hours*3600 + mints*60 + seconds;
cout<<"Total seconds are: "<<total_seconds<<endl;
}
// test code
// user inputs hours, minutes and seconds and can also leave any of them by entering 0 that will not effect the program. Then function print_seconds is called to calculate and print the total seconds.
int main()
{
int h,m,s;
cout<<"enter hours if any or enter 0"<<endl;
cin>>h;
cout<<"enter mints if any or enter 0"<<endl;
cin>>m;
cout<<"enter seconds if any or enter 0"<<endl;
cin>>s;
print_seconds(h,m,s);
return 0;
}
Output:
enter hours if any or enter 0
2
enter mints if any or enter 0
25
enter seconds if any or enter 0
10
Total seconds are: 8710