Answer: V= 4500m^3
Explanation:
V= length x width x height
V = 600 x 3 x 2.5
V = 600 x 7.5
V = 4500
Answer:
Step-by-step explanation:
24 becuase add the two together then divide by two
Answer:
9
Step-by-step explanation:
9 = 3 * 3
27 =3 * 3 * 3
GCF = 3*3 = 9
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42