Answer:
The value of Cp (measure of potential capability) is 6.33.
Step-by-step explanation:
Given information: Process average = 2 inches, process standard deviation = 0.05 inches, lower engineering specification limit = 1.6 inches and upper engineering specification limit =3.5 inches.
The formula for Cp (measure of potential capability) is

Where, USL is upper specification limit, LSL is specification limit, σ is process standard deviation.
Substitute USL=3.5, LSL=1.6 and σ=0.05 in the above formula.




Therefore the value of Cp (measure of potential capability) is 6.33.
19 = h/3 - 8
add 8 to each side
19+8 = h/3 -8 +8
27 = h/3
multiply by 3 on each side
27*3 = h/3 *3
81 = h
First you'd substitute x= y-3 in the first equation.
10(y-3) -10y= 1
10y - 30 -10y= 1
The y's cancel each other out, so you're left with -30= 1. That means there's no solution :)
The answer is 132. 132 is the original price. 80$ x 65% = 52. 80 + 52 = 132. So 132 is answer and original price.