Warzone easily but gta a close second
124.59 in expanded form is:
100 + 20 + 4 + 0.5 + 0.09
Answer: Scope creep
Explanation:
Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.
It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.
So, that is why it is the biggest problem we usually face in the project management.
Answer:
tabs.
Explanation:
Microsoft Word refers to a word processing software application or program developed by Microsoft Inc. to enable its users to type, format and save text-based documents.
In Microsoft Word 2019, the users are availed with the ability to edit the word document in the following view type;
I. View Mode.
II. Print Mode.
III. Drift Layout.
To easily and quickly convert text to tables in Microsoft Word, you should insert common separators between the text columns. The common separators or delimiters used when converting a table to text include tabs, paragraph marks, or commas.
Tabs or commas are used to indicate where the texts are divided into table columns while paragraph marks indicate where a new table row begins.