Answer:
False
Step-by-step explanation:
Onyx is made for jewels.
Answer:


Step-by-step explanation:
Given
The translated triangles
Required
Find x and y
We have:


means:

Open bracket

Collect like terms


Divide by 6

means

Open bracket

Collect like terms


Divide by 2

Solve for x in 2nd equation
times -1 both sides
x-5=6y
add 5
x=6y+5
sub
5(6y+5)+4y=-26
30y+25+4y=-26
34y+25=-26
minus 25 both sides
34y=-51
divide both sides by 34
y=-3/2
sub back
x=6y+5
x=6(-3/2)+5
x=-18/2+5
x=-9+5
x=-4
(-4,-3/2) is solution
Answer:
<em>Most likely time, </em>according to PERT (Program evaluation and review technique).
Step-by-step explanation:
PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.
Inside PERT, there are different defined times to accomplished an activity in a project, that is:
- An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
- A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
- A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
- An <em>expected time</em>, an statistical estimation.
Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":
- "[...] in as few as 15 days" is the <em>optimistic time</em>.
- "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
- "[...] but most likely will require 20 days" is the <em>most likely time</em>.
As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.
83 + 94 + 79 + 97 + 96 + 87 = 536.
536 ÷ 6 = 89.333333...
So, Lamonts' average is under 90.