After you use the fill handle to copy cell contents, the autofill options button appears, which can be used to fill the cells with only specific elements of the copied cell. The button <span>is a small square that appears in the bottom-right corner when you select a cell or range.</span>
Answer:
The answer is "Option B"
Explanation:
In the given code, a class "DateType" is declared, inside the class, four methods "Initialize, GetYear, GetMethod, and GetDay" is defined, in which the "Initialize" method does not return any value and other methods return a constant type value, which means it value can't be changed.
Inside the class three integer variable is defined, that is"year, month, and day". In the "GetDay" method call, it first creates the class object "day1", which is already defined in question and call the method by dot (.), that's why only choice b is correct.
Answer:
c. just a few weeks to install.
Explanation:
ERP is known as Enterprise Resource Planning.ERP implementation involves software installation, transfer of the financial data to the new system, configuration of the users and processes and training the users on the software.
It also involves upgrades after installation,cross-functional teams, intensive training, high funding for both initial cost and maintenance. This whole process usually takes place between 6 months to 2 years. This makes option C which says it takes few weeks to install incorrect.
<u> Quality assurance manager</u> is an internal user who uses product lifecycle management (plm) software and its data.
<h3>What is quality assurance manager?</h3>
The quality assurance manager is accountable for delivering optimum quality of a company's benefits or goods. In addition to maintaining constant quality, they help to ensure keeping with laws, regulations, and environmental standards, recommending improvements where required.
<h3>What is the qualification of a Quality Assurance Manager?</h3>
Quality Assurance Manager Requirements:
Bachelor's degree or associate's with knowledge in the field. Technical proficiency must be able to use computers and generate reports. Capacity to analyze data and create and review processes. Excellent communication skills.
To learn more about quality assurance manager, refer
brainly.com/question/15855298
#SPJ4
Complete question is,
a. Packaging supplier
b. Contract manufacturer
c. Manufacturer's design partner
d. Quality assurance manager
Answer:
Explanation:
One group of students did an experiment to study the movement of ocean water. The steps of the experiment are listed below.
Fill a rectangular baking glass dish with water.
Place a plastic bag with ice in the water near the left edge of the dish.
Place a lighted lamp near the left edge of the dish so that its light falls directly on the plastic bag.
Put a few drops of ink in the water.
The student did not observe any circulation of ink in the water as expected because the experiment had a flaw. Which of these statements best describes the flaw in the experiment? (2 points)
Not enough ink was added.
Not enough water was taken.
The dish was too small for the experiment.
The lamp and the ice bag were at the same place.