Answer:
6 men finish a piece of work in 8 days
1 men finish a piece of work in 8*6 days
4men will finish a piece of work in 48/4
days
..
which is equal to 12 days
Answer:

Step-by-step explanation:
Given claim : From the time shoots are planted 90 days on average are required to obtain the first berry.
. The sample mean is 92.3 days. The corporation wants to know if the mean number of days is different from the 90 days claimed.
As we know that the null hypotheses shows there is no statistical difference between the groups but the alternative hypothesis is opposite to it, it shows there is difference.
Thus , the correct hypotheses will be :-

Answer:
ok
Step-by-step explanation:
yeah
Answer:
The answer is D
Step-by-step explanation:
I took the test and it was 1 inch equals 4 feet :)
There are about 8cm in 3.2 inches