Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
For the domain
3-x >= 0
3 >= x
Answer:
Haeather ran at a speed of 5 miles per hour.
Step-by-step explanation:
Given that last week at the park Haeather ran 4 miles in 48 minutes, to determine what was Haeather rate of speed in miles per hour the following mathematical calculation must be performed:
48/4 = 12
Thus, Haeather ran 1 mile every 12 minutes.
60/12 = 5
1 x 5 = 5
Therefore, Haeather ran at a speed of 5 miles per hour.
<u>Answer</u>
4m
<u>Explanation</u>
Δqrp is a right triangle.
If ps = 6m then, qp = 3m. So we can find line pr using pythagoras theorem.
rp = √(5²-3²) = √16 = 4m
The Δqrp≡Δqtp.
Number of tables al four restaurants have;
= 4 * 30
=120 tables
Two new restaurants + 4
=6 restaurants
(120+15+9)= 144 tables
Mean = total # of tables/ total # of restaurants;
144/6
=24
This is the mean so it decreases. I hope this helps even though you didn’t actually post the number line