-4/3x (or -1 1/3x if you use whole numbers instead of an improper fraction) -7 = 1
Answer:
Graph the trigonometric function using the amplitude, period, phase shift, and vertical shift.
Amplitude: 1
Period: π
Phase Shift: 0 (
0 to the right)
Vertical Shift: 1
Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%