Answer:
4 to the -4 power
Step-by-step explanation:
multiply the 4's and add the exponents. then divide by 4 and divide by that exponent
Answer:
It will take Machine A 20 additional minutes.
Step-by-step explanation:
First we have get the rate of work per hour, Machine A builds 1/2 of a car per hour, while Machine B builds 1/3 of a car per hour.
Using this we can determine the amount of work that has been done so far in one hour before Machine B broke down:
1/2 + 1/3 = 3/6 + 2/6 = 5/6
Now we can produce an equation accordingly to determine how much time it'll take machine a to finish the job:
5/6 + 1/2x = 1
1/2x = 1/6
x = 1/3 hours = 20 minutes
Note: In the question you typed "how much additional time will it take machine b to finish" but I think you meant machine a because machine b broke down. Please correct me if I'm wrong.
Hope this helps! And let me know if you have any questions!
Answer:
C. 
Step-by-step explanation:
To find the slope when you know two points, use this formula:
M = y₂ - y₁ ÷ x₂ - x₁
M = (4 - (-8)) ÷ (0 - (-7))
M = 12 ÷ 7
M = 
Hope that helps.
Answer:
Inequalities if it has
symbols
Equations if it has =
Step-by-step explanation:
Answer: 800pi inches
=======================================
Explanation:
The formula to find the circumference of a circle is
C = pi*d
where
C = distance around the circle (aka circumference)
pi = 3.14 approximately
d = diameter
We know that the diameter of the wheel is d = 8, so
C = pi*d
C = pi*8
C = 8pi
is the circumference of the wheel
One full rotation will have the wheel cover a distance of 8pi inches. Imagine that wet paint is on the outer surface of the wheel. If the wheel is rolled out in a straight line, then the wet paint would cover a linear distance of 8pi inches along the flat ground. This is one full rotation, so 100 rotations covers 100*8pi = 800pi inches
Note: if we use pi = 3.14 as the approximation, then the hamster ran approximately 800*pi = 800*3.14 = 2512 inches if the wheel could move