The answers should be 4.5 feet
I think it is 584 km cubed
Answer:
Step-by-step explanation:
All the masses here are based on the main mass of the sand. So we will call sand "x". If there is two times as much cement as sand, then cement is 2x; if there is three times as much stone as sand, then stone is 3x. All of these added together equal a mass of 600 kg:
x + 2x + 3x = 600 so
6x = 600 and
x = 100 kg
There are 100 kg of sand. That means that there is 200 kg of cement and 300 kg of stone
The answer is D.
The first one says you add -4 each time in the sequence.
The second says you add -2 each time in the sequence.
The third says you multiply by -2 each time in the sequence.
The fourth says you multiply by -4 each time in the sequence.
-2*-4=8
8*-4=-32
The answer for this question is 13.43
hope you get the answer right