Answer: True, False, False, False, False
<u>Step-by-step explanation:</u>
a) 5x - 7(x - 1)
5x - 7x + 7
-2x + 7 ⇒ a = -2, b = 7 <em>One Solution</em>
b) 3(x - 5) - 7
3x - 15 - 7
3x - 22 ⇒ a = 3, b = -22 <em>One Solution</em>
c) 2 - 7x + 3 + 4x
4x - 7x + 3 + 2
-3x + 5 ⇒ a = -3, b = 5 <em>One Solution</em>
d) -3(x - 3) - 1
-3x + 9 - 1
-3x + 8 ⇒ a = -3, b = 8 <em>One Solution</em>
e) -5x + 2 + 2x + 4
-5x + 2x + 2 + 4
-3x + 6 ⇒ a = -3, b = 6 <em>One Solution</em>
Answer: Last Option

Step-by-step explanation:
In this case we have a uniform probability. In the graph the horizontal axis represents the possible values of the variable x and the vertical axis represents the probability P(x).
To calculate the probability that x is between 4.71 and 7.4 we calculate the area under the curve.
The horizontal length between 4.71 and 7.4 is:
.
Then notice that the vertical length in this interval is 0.125.
Then the area of a rectangle is:

Where l is the length and w is the width.
In this case we have to:


So


Your answers is 30, use this pic to show ur work
Answer:
b: 261,763
Step-by-step explanation:
do the parenthesis then mutiply the 2 #s
Cost = c
names are abbreviated
w = 1/3c
s = 1/3c + 6
from here i cant go further because i don't know what the numbers mean in the 2:5 ratio. but i will continue if u tell me. for example, could it be the paid cost to the total cost ratio?