Answer:
23 days
Step-by-step explanation:
We are told that the stadium holds 7500 individuals.
Now, if 600 seats have already been made, It means the number of seats left to be made to complete the stadium = 7500 - 600 = 6900 seats
We are told that 300 seats can be made in a day. Thus, number of days to be used to finish the remaining seats = 6900/300 = 23 days
Thus, it will take 23 days to complete all the 7500 seats.
Answer:
Yes, Kedir made profit.
Step-by-step explanation:
0.30 x 200 = 60 Birr
60 Birr is more than 50 Birr
He made profit of 10Birr, which is 20% of 50 Birr
Please find the attachment below for the solution...
Answer:
844368.7 m
Step-by-step explanation:
We are given that a typical sugar cube has an edge length of 1.00 cm.
We have to find the edge length of the box in meters.
Edge length of sugar cube=1 cm =
(
)
Volume of a sugar cube=
1 mole of sugar=
Volume of 1 unit=
Volume of
units=
Volume of box=1 mole of sugar=
Edge length of box=![\sqrt[3]{6.02\times 10^{17}}=844368.7 m](https://tex.z-dn.net/?f=%5Csqrt%5B3%5D%7B6.02%5Ctimes%2010%5E%7B17%7D%7D%3D844368.7%20m)
ANSWER
The larger number is 18
<u>EXPLANATION</u>
Let x be the larger number and y be the smaller number.
Then,


Let us add equation (1) and (2).

Divide through by 2

Put
in to equation (1).
This implies that,

