Answer:
1.Go to the View tab and select Watch.
2.Comparison
3.Editing
4.Drawing (I think)
5.Predesigned slides available for creating a new presentation
Explanation:
Answer:
Plasma monitors are power hungry devices 2 - 3 times more than a CRT monitor making this technology unfit for use in portable devices like laptop computers where batteries are used as the power source. Plasma monitors are extremely susceptible to screen burn.
Explanation: pls mark my answer as brainlist
Answer:
Option B, Vanishing point
Explanation:
The complete question is
Where do the projection lines converge in a perspective sketch?
A. the ground line
B. the vanishing line
C. the eye point
D. the horizon line
Solution
A point lying on the image of a perspective drawing where the drawings ( two-dimensional perspective projections) of two parallel line meet in three dimensional space is known as Vanishing point
Answer:
Column matching given in explanation
1. Intranet : <em>a network of computer within an organization</em>
2. Placeholder: <em>an empty area that reserves space for new content</em>
3. Presentation: <em>information delivered to an audience</em>
4: Presentation Technology: <em>a software application that helps organize and convey information</em>
5. Keynote: <em>the main speech delivered to all in attendance</em>
Explanation:
Intranet:
A small network that exist in the small organization or company to connect all the computers in organization.
Placeholder:
In computer programming, few variables has been defined in the start of program. These variables have no value initially but can be utilized at the time of need. These variable holds some space in memory that is called Placeholder.
Presentation:
A piece of information relevant to some particular topic, which will be delivered to a particular audience is called presentation.
Presentation Technology:
The tools that are used to assist presentation such as projector, slides, boards etc. are called presentation technology.
Keynote:
The main idea of speech that presenter want to deliver to the audience is called Keynote.
Answer:
An incurred cost that cannot be recovered, which is irrelevant for all decisions about the future, is included in the projected cost of a project. According to "Thinking Like an Economist," this an example of:<u> Failing to ignore sunk costs</u>
Explanation:
A sunk cost is a cost that cannot be recovered or changed and is independent of any future costs a business may incur. Since decision-making only affects the future course of business, sunk costs should be irrelevant in the decision-making process