Answer:
(2,1) (7,1) (7,5) (2,5)
Step-by-step explanation:
Just line up the dots on the x axis and y axis
Vertexes are the points or "corners" of the shape, and in your case, that square.
I hope this helped :D
Answer:
y=1x-5
Step-by-step explanation:
Answer:
2
Step-by-step explanation:
1/8 2/8 3/8 4/8 5/8 6/8 7/8 8/8
8/8-6/8=2/8
First, Joe started the water and it was at full force. He filled it up to 9 inches. It took him 2 minutes to get to 9 inches. Then, he stopped it for 2 minutes because his mom called him to get a bar of soap. The water level was still at 9 inches when he stopped it. Then, he put the water to come down slowly because he wasn’t sure how much more he needed. He let the water go for 2 minutes. Then, he stopped the water when it was at 12 inches of water. He sat in the bath for 5 minutes until he decided he was to cold so he hopped out. The water then drained really fast. From 12 inches to 0 inches it took the bath 3 minutes.
Let x and y be the rate per hour for Mechanic 1 and 2 respectively.
Then,
x+y=205 ---------- (1)
Additionally,
10x+15y = 2500 ------ (2)
Solving equations 1 and 2;
Multiply (1) by 10 and subtract two from the result,
10x+10y = 2050
10x +15 y =2500
----------------------
-5 y = --450 => y = 450/5 = $90
Then,
x= 205-90 = $115
Therefore,
Mechanic 1 charged $115 per hour
Mechanic 2 charged $90 per hour