1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Masja [62]
3 years ago
14

Can somebody help me

Mathematics
1 answer:
Keith_Richards [23]3 years ago
8 0
C

Hope this helps!



Have a good day:)
You might be interested in
Which inequality statement best represents the graph?
Akimi4 [234]

Answer:

Step-by-step explanation:

If you have choices, you really should list them.

Here is the graph for y = (x  + 0.25)(x - 1.75) which will look like yours. There are all sorts of variations that are possible, but at least I could reproduce a similar looking graph.

6 0
3 years ago
The population of current statistics students has ages with mean muμ and standard deviation sigmaσ. samples of statistics studen
Aleonysh [2.5K]

What does the central limit theorem tell us about the distribution of those mean​ ages?

<span>A.    </span>Because n>30, the sampling dist of the mean ages can be approximated by a normal dist with a mean u and a SD o/sqrt 54,

Whenever n<span>>30 the central limit theory applies.</span>

6 0
3 years ago
2 (2x + 3 = 1)<br> 7 — бу = 20
max2010maxim [7]

Answer:

x = -1    y =  - 13/6

Step-by-step explanation:

4 0
3 years ago
a shoe box in the shape of right rectangular prism has base that mesure 7 inches and is 5 inches high what is the volune of the
Andrew [12]

Answer:

35

Step-by-step explanation:

If the base is 7 that would be the length times width and then you multiply that by 5 which gets you 35.


7 0
3 years ago
Five workers together can build a road in 20 days. Suppose every worker works at the same rate. Three workers work on the road f
Scilla [17]

Answer:

5 days

Step-by-step explanation:

This problem is an inverse proportion case. Having two variables: number of workers and time (in days); when we increase the number of workers, the time needed decreases; vice versa. Therefore, we can use the multiplication method: (workers * time) will always stay constant.

Let's say the time (in days) needed by the eleven workers is t,

5*20 = (3*10) + (14*t)

100 = 30+14t

70 = 14t

5 = t

It will take the eleven-workers 5 more days to finish the road.

8 0
2 years ago
Other questions:
  • Solve the inequality -6w&lt;21
    15·1 answer
  • If the circumference is 3/2 pi what is the area
    11·1 answer
  • 3621 ×4 help me on this please
    15·2 answers
  • Explain how to use the missing pieces strategy to compare two fractions. Include a diagram with your explanation.
    11·1 answer
  • Mrs. Becker loves Starbucks coffee. Today, while waiting to place her order for her non-fat white chocolate mocha without toppin
    7·2 answers
  • Find the slope of the line that passes through the following points (2,5) (5,11)
    8·2 answers
  • What is the ratio of the length of the rectangle to its width. 24 and 20
    6·1 answer
  • F(x)=1/2(x-2)(x+3)^3
    15·1 answer
  • Use the rectangle below as an example
    13·1 answer
  • f(x)=(x+3)(x-4) and g(x)=1/3(x+3)(x-4). the graphs of each are shown here. Which graph represents which polynomial function? exp
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!