1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
solniwko [45]
2 years ago
9

a fruit seller had thought to sell 120kg of fruit at 150 dollars / kg but sold it 5% less. find out how much dollars the seller

lost​
Mathematics
1 answer:
Nady [450]2 years ago
3 0
900$ loss

X/150=.05/1
x= 142.5

120(142.5)=17100
120(150)= 18000

18000-17100= 900
You might be interested in
Algebra help please
Tema [17]
I can and will help if you give me something to help with.
8 0
3 years ago
How many feet are in 42 inches
yarga [219]

Answer:

3.5 feet.

Step-by-step explanation:

There are 12 inches in a foot.

So, 42 ÷ 12 = 3.5.

Hope this helped, have a blessed day and best of luck!

7 0
3 years ago
Read 2 more answers
Need answers for 13, 12, and 13
Marysya12 [62]

Step-by-step explanation:

-0.45 = 9/20

2.77= 2 7/9

5.55  = 5 5/9

5 0
3 years ago
1. A company produces two types of nutritional supplements; Energize and Excel. Energize contains 26 mg of vitamin A, 42 mg of v
geniusboy [140]

Answer:

1)A) Minimize C = 40x + 100y.

2) d) 7x + 8y ≤ 190, 5x + 4y ≤ 22, x ≥ 0, y ≥ 0.

3) B) Min C = 295x + 416y; s.t 23x + 15y ≥ 154, 17x + 25y ≥ 140, x ≥ 0, y ≥ 0.

Step-by-step explanation:

1) Energize pills cost 40 cents each, while Excel pills cost 100 cents each. If x represent the energize pills and y represent the excel pills, the objective function would be:

minimize cost = cost of energize pill + cost of excel pill

Minimize cost = 40x + 100y

2) Let x = the number of mountain bikes they produce, and let y = the number of racing bikes they produce.

7 hours of assemble time to produce a mountain bike and 8 hours of assemble time to produce a racing bike. Since the company has at most 190 hours for assemble time, it can be represented as:

7x + 8y≤ 190

5 hours of mechanical tuning to produce a mountain bike and 4 hours of mechanical tuning to produce a racing bike. Since the company has at most 22 hours for mechanical tuning, it can be represented as:

5x + 4y ≤ 22

Also assemble time and mechanical time must be greater than 0, hence:

x ≥ 0, y ≥ 0

3) The fieldwork constraint can be represented as:

23x + 15y ≥ 154

The time to be spent at university research center can be represented as:

17x + 25y ≥ 140

Both fieldwork time and time spent at university research center mut be greater than 0, hence:

x ≥ 0, y≥ 0

The cost equation is:

Minimize cost = 295x + 416y

5 0
3 years ago
Please help me with another problem
lorasvet [3.4K]
"one" will fill both blanks.
8 0
3 years ago
Other questions:
  • 1. x+7=?
    5·1 answer
  • The value of x is ____
    13·1 answer
  • What is the answer for this. <br>simplify -6 ÷ 3​
    7·1 answer
  • g Which of the following is equivalent to P( A|B)? a. P(A and B) b. P(B|A) c. P(A)/P(B) d. None of these choices.
    12·1 answer
  • Find the ordered pair solution of y = (2/5)x + 2 corresponding to -5
    8·1 answer
  • This is for homework its a fraction <br> x/5 = 3
    5·1 answer
  • I only have a few minutes to get this question!<br> pls help &lt;3
    5·2 answers
  • What is the answer to 2.4 × 10-4
    13·2 answers
  • Tisha tried to evaluate an expression. Here is her work: 490÷729–23 = 490÷499–23 Step 1 = 109–23 Step 2 = 90–23 Step 3 = 883 Ste
    11·1 answer
  • If B is 60% more than A, then A is
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!