Answer:
Total length after 33 days will be 117 miles
Step-by-step explanation:
A construction crew is lengthening a road. The road started with a length of 51 miles.
Average addition of the road is = 2 miles per day
Let the number of days crew has worked are D and length of the road is L, then length of the road can represented by the equation
L = 2D + 51
If the number of days worked by the crew is = 33 days
Then total length of the road will be L = 2×33 + 51
L = 66 + 51
L = 117 miles
Total length of the road after 33 days of the construction will be 117 miles.