1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iren2701 [21]
3 years ago
15

Kyle held a balloon 8ft off the ground above his head and Ava is standing 15 feet directly to g the right of Kyle how far is Ava

from the balloon
Mathematics
1 answer:
ryzh [129]3 years ago
5 0

Answer:

17

Step-by-step explanation:

Pythagorean theory baby! Okay so the Pythagorean theory is a² + b² = c² so lets draw a triangle and label our sides. So we know 8² + 15² = c² so I'm going to find the square root of all of our numbers. We get 64 + 225 = c² so then add 64 + 225 = 289 then I take the square root of 289 which equals 17 . This answer also makes sense because out hypotenuse should always be bigger then the legs.

I'm pretty sure thats right, Hope this helps.

You might be interested in
PLEASE ANSWER THIS MATH QUESTION FOR THOSE MATH LOVERS :)
viva [34]

Remark

The general formula for these types of questions is

(x1 + k(x2 - x1) ) , (y1 + k(y2 - y1))

<u>Problem 1 -- Point G</u>

Givens

(x1,y1) is the starting point which in this case is (-3, -3)

(x2,y2) is the ending point which in this case is (6 , -3)

k = 1/4

Sub and solve

(-3 + 1/4(6 - - 3), - 3+ 1/4(- 3 - - 3)

(-3 + 1/4(9) , - 3 + 1/4 (-3 + 3)

(-3 + 9/4, -3 + 1/4(0) )

(-12/4 + 9/4 , -3)

(-3/4 , - 3) Answer

<u>Problem 2 Point F Much harder</u>

Givens

(x1,y1) = (-3 , -1)

(x2,y2) = (6, - 3)

k = 3/4

Sub and solve

(-3 + 3/4(6 - - 3) , -1 + 3/4(-3 - - 1) )

(-3 + 3/4(9) , - 1 + 3/4(-2) )

(-3 + 27/4 , -1 - 6/4 )

(-12/4 + 27/4, -4/4 - 6/4)

( 15/4 , - 10/4) <<<<<< Answer Part B

4 0
3 years ago
Read 2 more answers
An art teacher needs to 5 boxes of markrrs to complete a project with a class of 20 students. How many boxes of markers will he
sleet_krkn [62]

20students : 5 boxes

Divided by 5

4students : 1 boxes

28students : x boxes

28/4 = 7

28students : 7 boxes

4 0
3 years ago
Use even-numbered tiles 0, 2, 4, 6, and<br> 8 to make the smallest difference.
Usimov [2.4K]

Answer:

Step-by-step explanation:

6+2 = 8 your welcome or 4 x 2 = 8 :)

8 0
3 years ago
I need more help....sorry haha
kozerog [31]
Number 7:   11/12-9/10 = 110/120-108/120=2/120= 1/60

number 8:     5/18-1/3=15/54-5/54=10/54 =5/27
5 0
4 years ago
Read 2 more answers
. The time required for a technician to machine a specific component is normally distributed with a mean of 2 hours and a standa
erma4kov [3.2K]

Answer:

a) There is a 3.84% probability that the technician can machine one component in 1.5 hours or less.

b) There is a 0.42% probability that the technician will require at least 2.75 hours to complete one component

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have to be careful. The mean is in hours, while the standard deviation is in minutes. I am going to work with both in hours, as the problem states. 17 minutes is 0.283 hours, so:

\mu = 2, \sigma = 0.283

(a.) What is the probability that the technician can machine one component in 1.5 hours or less?

This probability is the pvalue of the Zscore when X = 1.5. So:

Z = \frac{1.5 - 2}{0.283}

Z = \frac{-0.5}{0.283}

Z = -1.77

Z = -1.77 has a pvalue of 0.0384.

This means that there is a 3.84% probability that the technician can machine one component in 1.5 hours or less.

(b.) What is the probability that the technician will require at least 2.75 hours to complete one component?

The pvalue of the score of X = 2.75 is the probability that the technican will require less than 2.75 hours to complete one component. The probability that he will require at least 2.75 hours to complete one component is 1 subtracted by this pvalue. So:

Z = \frac{2.75 - 2}{0.283}

Z = \frac{0.75}{0.283}

Z = 2.65

Z = 2.65 has a pvalue of 0.99598.

This means that the probability that the technican will require at least 2.75 hours to complete one component is 1 - 0.99598 = 0.0042 = 0.42%.

4 0
4 years ago
Other questions:
  • The class size increased 25% to 40 students. What was the original class size?
    14·2 answers
  • If you have 3 pairs of pants and 5 shirts how many possible outcomes are there for wearing of the pants with one of the five shi
    15·2 answers
  • What is the slope of the line?<br><br> A. 0 <br><br> B. 5<br><br> C. 11<br><br> D. Undefined
    10·2 answers
  • Which sequence of transformations produced the image?
    10·2 answers
  • Simplify the number into simplest radical form.
    9·1 answer
  • Triangle ABC has vertices at A(−1 , 2), B(4, 2), and C(3, −1). Classify the triangle according to the side lengths.
    6·2 answers
  • Can u help me with number 7 if you get the brain thing
    8·2 answers
  • 1.) Conrad earns a 7.5% commission on his sales of office supplies. Last month, he earned $836.50 in commissions. What were his
    10·1 answer
  • What is 2.3, 2.2031, 2.23, 1.426 from least to greatest?
    12·1 answer
  • x3+y3+z3= plz help if you can sell this you're really smart you're really kind and you're really good at math I need your help s
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!