Exercise 1 Usage of free production capacity

Mathematics
1 answer:
anyanavicka [17]3 years ago
8 0

Answer:

Step-by-step explanation:

You might be interested in
HELP PRECALC NEED IN PROOF FORM
Vinil7 [7]

Hello, please consider the following.

We know the following, right ?

(\forall a, b \in \mathbb{R}) \left( sin(a+b)=sin(a)sin(b)+cos(a)cos(b) \right)

So, here, it gives.

Asin(\omega t+\phi)=Asin(\phi){\sf \bf sin(\omega t)}+Acos(\phi){\sf \bf cos(\omega t)}\\\\=c_2{\sf \bf sin(\omega t)}+c_1{\sf \bf cos(\omega t)}\\\\\text{ *** where }c_2=Asin(\phi) \text{ and } c_1=Acos(\phi) \text{ ***}

Do not hesitate if you need further explanation.

5 0
4 years ago
ANSWER ASAP ILL GIVE BRAINLIEST
Anvisha [2.4K]

Answer: C

Step-by-step explanation: There are 9 cards. 3 are vowels. 3/9 reduces to 1/3

6 0
3 years ago
A 40<br> B 160<br> C 80<br> D 60
IceJOKER [234]

Answer:

ithink its A miight be wrong tho hope it helps in someway ig idk

Step-by-step explanation:

6 0
4 years ago
Read 2 more answers
It takes 15 electricians 24 days to wire a new housing subdivision. how many days would 18 electricians require to do the same j
Romashka [77]
15 electricians worked for 24 days to the whole job, now, there are 15 of them, so on any given day, each electrician worked one whole day, in 24 days, that one electrician worked 24 days total.

now, there were 15 electricians on any given day though, since each one of them worked the whole day that one day, so the "days work worth" on a day is 15, so the house gets 15days worth of work because of that.

so how many "days worth" did all 15 do on the 24 days, well, 15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15, namely 15 * 24, or 360 days worth of work.

since it takes 360 days worth of work to do the whole wiring, in how many days would 18 electricians do it?   360/18.
4 0
4 years ago
Read 2 more answers
NEED ANSWER AS SOON AS POSSIBLE!!
umka21 [38]

Answer:

It's -8.

Step-by-step explanation:

The 5 in the f(5) is the 5 in the x column. Then you just find its value, which is -8

5 0
3 years ago
Other questions:
  • A craft stick fits exactly on the diagonal across the bottom of the rectangular craft box shown in the diagram below.
    10·1 answer
  • The big five personality factors are reported to have a heritability of approximately _____ percent for each dimension. 40 30 20
    5·1 answer
  • Solve for x.. please help
    8·2 answers
  • An isosceles triangle has two sides of equal length, a, and a base, b. The perimeter of the triangle is 15.7 inches, so the equa
    7·2 answers
  • Use this equation of the circle: (x-2)2+(y+6)2=4
    13·1 answer
  • Help find the measure of b
    9·2 answers
  • 3(x+4)=27 please help
    7·2 answers
  • Determine an expression for dy<br> dx given that x = sin3<br> (t)andy = cos3<br> (t)
    13·1 answer
  • Which variable is most important to the following problem? After two hours, Kaylee measured the temperature of a mixture to be 6
    11·1 answer
  • 2. David has 5 times as much as money as Michael at first. Both received $87 each. David
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!