Answer:
= Sh. 2281.50
Step-by-step explanation:
Area of the path;
(126 × 2.5 ) + (2.5 × (48 - (2.5×2)
= 315 + (2.5 × 43)
= 315 + 107.5
= 422.5 m²
But; the cost of graveling is sh 5.40 per square meter
Therefore; The cost of graveling the whole path;
= 422.5 × 5.40
<u>= Sh. 2281.50</u>
The correct answer for the given question above would be option C. In the metric system, the one that has shown a correct equivalent of measurement is 100 centimeter = 1 meter. And in every 1 centimeter, there is 0.01 meter. The rest of the options are not correct so the answer is C.
Answer:
2
Step-by-step explanation:
60/30 is 2
HOpe this helps :D
PLz mark brainliest if correct :D
Answer:
There was an 11% increase.
Step-by-step explanation:
The formula to find a percent increase is this: (original amount - new amount / original amount) * 100
If you fill in the formula, you get this:
(164,000 - 182,040 / 164,000) * 100
Solve:
(-18,040 / 164,000) * 100 ---> If the number being divided is negative, find the absolute value.
(18,040 / 164,000) * 100 =
0.11 * 100
11%