Answer:
B. 100
Step-by-step explanation:
(m + n)^2
= m^2 + 2mn + n^2
Rearrange
(m^2 + n^2) + 2mn
Substitute
(68) + 2*16
= 68 + 32
= 100
Answer:
Width = 9ft.
Length=22ft.
Step-by-step explanation:
Answer: 0.02
Step-by-step explanation:
OpenStudy (judygreeneyes):
Hi - If you are working on this kind of problem, you probably know the formula for the probability of a union of two events. Let's call working part time Event A, and let's call working 5 days a week Event B. Let's look at the information we are given. We are told that 14 people work part time, so that is P(A) = 14/100 - 0.14 . We are told that 80 employees work 5 days a week, so P(B) = 80/100 = .80 . We are given the union (there are 92 employees who work either one or the other), which is the union, P(A U B) = 92/100 = .92 .. The question is asking for the probability of someone working both part time and fll time, which is the intersection of events A and B, or P(A and B). If you recall the formula for the probability of the union, it is
P(A U B) = P(A) +P(B) - P(A and B).
The problem has given us each of these pieces except the intersection, so we can solve for it,
If you plug in P(A U B) = 0.92 and P(A) = 0.14, and P(B) = 0.80, you can solve for P(A and B), which will give you the answer.
I hope this helps you.
Credit: https://questioncove.com/updates/5734d282e4b06d54e1496ac8
Answer: 2.2 meters
Step-by-step explanation:
The data is:
The initial piece is 6.35 meters long.
We cut 25 pieces of 16.2cm each, so in pieces only we have:
25*16.2cm = 405cm
1m = 100cm
Then: 405cm = (405/100) m = 4.05m
And each time that we cut a piece, we have 4mm of waste.
Then we have 25 times the 4mm of waste, this means that the total waste is:
4mm*25 = 100mm
and 1000mm = 1m
100mm = (100/1000) m = 0.1m
So the total amount that was cut is:
4.05m + 0.1m = 4.15m
The length in the channel iron will be: 6.35m - 4.15m = 2.2 meters
Answer:
Summarize the end of the story and explain the resolution— when the conflict is solved :
At the end of the story...
Step-by-step explanation: