Answer: You are correct.
Step-by-step explanation: You are correct because 126 divided by 6 equals 21.
Total sol lemon juice, H20 % total lemon
9 70% 6.3
x 30% .3x
a) 9-6.3=2.7 ounce of pure lemon.
b) 6.3 ounce of water is in the same mixture
The number of $0.50 increases to maximize the profit is X = 1.
First of all, we need to write the linear function which represents the price of the ticket for each increase of $0.50:
P - Price of each ticket.
x - number of increases.
We know that the current price is $5.00, so:

After that, let's build a linear function which shows the number of tickets sold <u>for each</u> price increase:
T - number of tickets.
x - number of increases.

With all this done, we can finally build the quadratic function which represents the money earned:
M - money earned

Now, to finish, we only have to <u>calculate the value of X</u>(number of increases) which can give us the maximum value of this function:
the X coordinate for the maximum value of a quadratic is expressed by:

In our equation, b = 100 and a = - 50 :

Thus, the number of increases which <u>maximizes</u> the profit is 1.
Learn more about linear and quadratic functions in: brainly.com/question/4119784
Answer:

Step-by-step explanation:
Let assume that boiling point of water diminish linearly with the increase on altitude. Then, the expression needed is this first order polynomial:

The boiling point of water at a height of 8.85 km is:

Answer:
<u> </u><u> </u><u> </u><u> </u><u> </u><u> </u><u>1</u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u>
-7x
Step-by-step explanation:
the rule of indices states that any thing raised to power of - 1 is 1 over the number. (e.g: 8^ -1 = 1/8 or 7^ -2 = 1/7²
therefore;
(-7x)‐¹ = <u> </u><u> </u><u> </u><u> </u><u> </u><u>1</u><u> </u><u> </u><u> </u><u> </u>
-7x
please remark brainliest