Answer: there are 59059 lbs of gravel.
Step-by-step explanation:
In a mixture of concrete, there are four lbs of cement mix for each pound of gravel. This means that eight lbs of cement would be mixed for 2 pounds of gravel and 12 lbs of cement would be mixed for 3 pounds of gravel and 12. Therefore, the constant ratio of cement to gravel is 4:1
The total ratio is 4 + 1 = 5
If the mixture contains a total of 295295 lb of these two ingredients, then the number of pounds of gravel that are there is
1/5 × 295295 = 59059 lbs
If you divide 100 by 4 which equals 25 that would be 25mins for one ugly sweater
If you times by 2 that equals 50
If 6=4+2 then you add 100 and 50 together which makes 150.
When the first number increases by one the second number is added by 4's. So from the first part to the second it added 4 then from the 2nd to the 3rd it skips adding 8 to then just add 12. Then from the 3rd to the 4th it skips adding 16 and adds 20. So the next set of numbers would be (4,64) because it skips adding the 24 and adds the 28.
Hope this helps and is not to confusing :)
Answer:
What is the question?
Step-by-step explanation: