Answer:
Maintenance Phase
Explanation:
One of the concepts employed in project management for describing stages involved when carrying out an information system development project is the systems development life cycle (SLDC). The cycle which starts from carrying out a feasibility study and ends in maintenance is a highly used conceptual model. There are 5 major stages or phase and they are the; Requirement Phase, Design Phase; Implementation Phase, Test Phase, and the Maintenance phase. The maintenance phase comes when testing has been complete and all enhancement and modifications have already been developed, and the system is operating.
Answer:
The code is as follows:
for(int j = 0; j < newScores.length-1; j++){
newScores[j] = oldScores[j+1];
}
newScores[oldScores.length-1] = oldScores[0];
Explanation:
This loop iterates through the elements of oldScores
for(int j = 0; j < newScores.length-1; j++){
This enters the elements of oldScores to newScores starting from the element at index 1
newScores[j] = oldScores[j+1];
}
This moves the first element of index 0 to the last index of newScores
newScores[oldScores.length-1] = oldScores[0];
num = float(input("Enter a number: "))
num1 = int(num)
print(num - num1)
I hope this helps!
Answer:
On the basis of brand computer are classified as:
• IBM Personal Computers.
• IBM compatible.
• Apple/Macintosh/Acer/LG/ Samsung etc.
hope it helps
pa brainliest po
Answer:
Explanation:
First a header is needed indicating which bash will be used (sh, zsh, bash, etc.), then it is necessary to change the file extension so that the system recognizes it as an executable file and no longer as text