1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
seraphim [82]
3 years ago
10

Garry is studying a square pyramid and wants to draw a net of the figure to help determine its surface area. Which net represent

s a square pyramid?please hurry than you
Mathematics
2 answers:
Blizzard [7]3 years ago
8 0

Answer: The answer is C

Step-by-step explanation: I just took the test

Olegator [25]3 years ago
4 0

Answer:

The answer is C

Step-by-step explanation:

You might be interested in
The cost of 6 pounds <br> of coffee is $3.
4vir4ik [10]

Answer:

ok 2 pound per 1 doller and 1 pund per0.50 cent

Step-by-step explanation:

4 0
3 years ago
In the Pythagorean Theorem, what<br> does the "a" stand for?<br> a2 + b2 = c2
Sophie [7]

Answer:

A theorem stating that the square of the length of the hypotenuse of a right triangle is equal to the sum of the squares of the lengths of the other sides. It is mathematically stated as c2 = a2 + b2, where c is the length of the hypotenuse and a and b the lengths of the other two sides.

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
Geometry ∠1 and ∠2 are vertical angles. If m∠1 = 17x + 1 and m∠2 = 20x – 14, find m∠2.
stiv31 [10]

Answer:

m∠2= 86

Step-by-step explanation:

since they are vertical angles, that means they are both equal to eachother.

so lets set them equal!

17x+1=20x-14

17x+15=20x

15=3x

x=5

now input x into m∠2

m∠2 = 20(5) – 14 = 86

7 0
4 years ago
Whoever answers all three correctly is who I’ll give brainlist to.
leonid [27]

Answer:

a c d i think those are answers

4 0
3 years ago
Read 2 more answers
The time required to complete a project is normally distributed with a mean of 80 weeks and a standard deviation of 10 weeks. Th
matrenka [14]

Answer: the due date would be 92 weeks

Step-by-step explanation:

Since the time required to complete a project is normally distributed, we would apply the formula for normal distribution which is expressed as

z = (x - µ)/σ

Where

x = number of weeks.

µ = mean

σ = standard deviation

From the information given,

µ = 80 weeks

σ = 10 weeks

If a construction company bidding on this contract wishes to be 90 percent sure of finishing by the due date, the z score corresponding to 90%(90/100 = 0.9) is 1.29

Therefore,

1.29 = (x - 80)/10

x - 80 = 1.2 × 10

x - 80 = 12

x = 80 + 12 = 92

5 0
3 years ago
Other questions:
  • How many ninths does it take to make the same amount as 1/3 and draw a picture to show how it would look im fractions
    6·1 answer
  • The set of all outcomes of a rolled die is 1, 2, 3, 4, 5, and 6. What is the subset of getting an even number?
    5·1 answer
  • It’s the same distance from the second base to the first base from the second base to third-base the angle formed by the first b
    5·1 answer
  • 1 + 2 please answer this
    5·1 answer
  • On a workday the average decibel level of a busy street is 69 db, with 139 cars passing a given point every minute. if the numbe
    9·1 answer
  • What is the square root of 900
    5·2 answers
  • a carnival game consists of 3 dart throws at a target. The probability of scoring a hit on any one throw is 30%. Using the binom
    9·1 answer
  • Mr. Clinton went to the lumber company. He bought 6 boards at a cost of $4.12 per board and 5 pounds of nails at $0.78 per pound
    10·2 answers
  • PLS HELP WILL GIVE BRAINLIEST
    12·1 answer
  • Where does the decimal go?
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!