1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iragen [17]
3 years ago
12

Please help I’ll give brainliest

Mathematics
1 answer:
zaharov [31]3 years ago
7 0

Answer:

The answer is c

I think so sorriy if it's not correct

Step-by-step explanation:

You might be interested in
It took bob 55min to clean the garage. How many seconds did it take bob.
Setler79 [48]
60x55= 3300 there are 60 seconds in a minute and there are 55 minutes so you simply multiply the seconds by the minutes
5 0
3 years ago
Read 2 more answers
The number of pieces of mail that a department receives each day can be modeled by a distribution having mean 44 and standard de
saveliy_v [14]

Answer:

Step-by-step explanation:

Assuming a normal distribution for the number of pieces of mail that a department receives each day, the formula for normal distribution is expressed as

z = (x - u)/s

Where

x = number of pieces of mail

u = mean

s = standard deviation

From the information given,

u = 44

s = 8

We want to find

P(x lesser than or 40) or P(x greater than 48)

For P(x lesser than or 40)

For x = 40,

z = (40 - 44)/8 = - 4/8 = - 0.5

Looking at the normal distribution table, the corresponding value of the z score is 0.30854

P(x greater than 48) = 1 - P(lesser than or or equal 48)

For x = 48,

z = (48 - 44)/8 = 4/8 = 0.5

Looking at the normal distribution table, the corresponding value of the z score is 0.69146

P(x greater than 48) = 1 - 0.69146 = 0.30854

The probability that the sample mean will be less than 40 or greater than 48 using is

0.30854 + 0.30854 = 0.69146

7 0
3 years ago
HELP ME PLEASE, ILL GIVE BRAINLIEST
Elena L [17]

Answer: I helped LOL

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
Someone help me with this question please
Valentin [98]

Answer:

We will need 16 tiles

Step-by-step explanation:

Each tile has a width of 1/4 ft

We want to know how many will fill 4 ft

This is a division problem

4 ft wall/ 1/4ft tiles =

copy dot flip

4 * 4/1 = 16

We will need 16 tiles

5 0
3 years ago
I have 5 marbles numbered 1 through 5 in a bag. Suppose I take out two different marbles at random. What is the expected value o
fomenos

Answer:

The expected values from the product of 2 marbles are 1,2,3,4,5,6,8,10,12,15,20

Step-by-step explanation:

THe expected values are 1,2,3,4,5,6,8,10,12,15,20

4 0
3 years ago
Other questions:
  • A rectangular prism has a base that is 5 cm by 7 cm and a height of 12 cm. if all dimensions are doubled, what happens to the vo
    5·2 answers
  • Indicate whether each of the following equations is sure to have a solution set of all real numbers. Explain your
    13·1 answer
  • Graph the system of equations on your graph paper to answer the question.
    7·1 answer
  • 19. Given m29 = 2x + 3, m27 = 3x – 9, and m/1 = x + 18, ,<br> what is the value of x?
    10·1 answer
  • Which math statement does not contain a variable?
    14·2 answers
  • What is the value of x
    14·2 answers
  • Calculate the volume of the sandcastle. Round to the nearest hundredth place.
    12·1 answer
  • Whoever responds first will get marked Best.
    7·1 answer
  • Plz help due tomorrow
    13·2 answers
  • Express tan M as a fraction in simplest terms.<br> Help please
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!