Answer:
(0.4958, 0.7422)
Step-by-step explanation:
Let p be the true proportion of water specimens that contain detectable levels of lead. The point estimate for p is
. The estimated standard deviation is given by
. Because we have a large sample, the 90% confidence interval for p is given by
where
is the value that satisfies that above this and under the standard normal density there is an area of 0.05. So, the confidence interval is
, i.e., (0.4958, 0.7422).
Answer: the future value is $1748.4
Step-by-step explanation:
We would apply the formula for determining compound interest which is expressed as
A = P(1+r/n)^nt
Where
A = total amount in the account at the end of t years
r represents the interest rate.
n represents the periodic interval at which it was compounded.
P represents the principal or initial amount deposited
From the information given,
P = 1550
r = 4% = 4/100 = 0.04
n = 365 because it was compounded 365 times in a year.
t = 3 years
Therefore,.
A = 1550(1 + 0.04/365)^365 × 3
A = 1550(1+0.00011)^1095
A = 1550(1.00011)^1095
A = 1550 × 1.128
A = 1748.4
Answer:
Isosceles and obtuse
Step-by-step explanation:
It is not a scalene triangle because it has two same lengths 41 degrees and 41 degrees.
<u>It is a </u>Isosceles triangle because two of the sides have the same lengths 41 degrees and 41 degrees
<u>It is an</u> obtuse triangle because it has on obtuse angle which is 98 and two acute angles that are 41 degrees
It is not an equilateral because not all of the sides are the same lengths
It is not a right triangle because there are 90 degree angles
It is not an acute triangle because not all the angles are acute angles
This question is incomplete, the complete question is;
In a survey, 55% of the voters support a particular referendum. If 40 voters are chosen at random,
find the mean and variance for the number of voters who support the referendum.
Answer:
a) The Mean is 22
b) Variance is 9.9
Step-by-step explanation:
Given that;
55% of the voters support a particular referendum p = 0.55
q = 1 - p = 1 - 0.55 = 0.45
sample size n = 40
a)
Mean = sample size n × p
Mean = 40 × 0.55
Mean = 22
Therefore the Mean is 22
b)
Variance = n × p × q
so we substitute
Variance = 40 × 0.55 × 0.45
Variance = 9.9
Therefore the Variance is 9.9
Answer:
12.87 12.1 12.07 12.07
Step-by-step explanation: