50 hours cause you take 150 divided it by 3
Answer:
m= 8/5
Step-by-step explanation:
Points on the graph: ( -4, -4) and (1, 4)
Slope:
m=(y2-y1)/(x2-x1)
m=(4+4)/(1+4)
m= 8/5
Answer:
The three unknown angles X, Y , and Z are:
X = 40, Y = 20, and Z = 120
Step-by-step explanation:
Let's name X the measure of the first angle, Y the measure of the second one, and Z that of the third one.
Then we can create the following equations:
X = 2 Y
Z = 100 + Y
and
X + Y + Z = 180
So we use the first equation and the second one to substitute for the variable X and Z in the thrid equation:
2 Y + Y + (100 + Y) = 180
4 Y + 100 = 180
4 Y = 80
Y = 80/4 = 20
Then X = 40, Y = 20, and Z = 120
Answer:
multiply by
Convert from Convert to
US gpd US gpm cfm IMP gpd IMP gpm
m3/s 22800000 15852 2119 19000000 13200
m3/min 380000 264.2 35.32 316667 220
m3/h 6333.3 4.403 0.589 5277.8 3.67
liter/sec 22800 15.852 2.119 19000 13.20
liter/min 380 0.2642 0.0353 316.7 0.22
liter/h 6.33 0.0044 0.00059 5.28 0.0037
US gpd 1 0.000695 0.000093 0.833 0.000579
US gpm 1438.3 1 0.1337 1198.6 0.833
cfm 10760.3 7.48 1 8966.9 6.23
Imp gpd 1.2 0.00083 0.00011 1
Step-by-step explanation:
googled it
Answer:
6.025 as a mixed number is 6 1/40